{"id":672,"date":"2026-03-04T01:06:28","date_gmt":"2026-03-03T17:06:28","guid":{"rendered":"https:\/\/verdewire.com\/?p=672"},"modified":"2026-03-04T01:06:28","modified_gmt":"2026-03-03T17:06:28","slug":"china-resources-shenzhen-headquarters-building-integrated-structured-cabling-system-supply","status":"publish","type":"post","link":"https:\/\/verdewire.com\/index.php\/2026\/03\/04\/china-resources-shenzhen-headquarters-building-integrated-structured-cabling-system-supply\/","title":{"rendered":"China Resources Shenzhen Headquarters Building \u2014 Integrated Structured Cabling System Supply"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"789\" height=\"500\" src=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/b1674b3d2a0bfaf4b8f34d46b6a1d0fd.png\" alt=\"\" class=\"wp-image-677\" srcset=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/b1674b3d2a0bfaf4b8f34d46b6a1d0fd.png 789w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/b1674b3d2a0bfaf4b8f34d46b6a1d0fd-300x190.png 300w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/b1674b3d2a0bfaf4b8f34d46b6a1d0fd-768x487.png 768w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/b1674b3d2a0bfaf4b8f34d46b6a1d0fd-600x380.png 600w\" sizes=\"(max-width: 789px) 100vw, 789px\" \/><\/figure>\n\n\n\n<p style=\"line-height:1.8\"><strong>Project Background<\/strong>: The client is China Resources Group, and the project is its Shenzhen Headquarters Building \u2014 a landmark super high-rise building integrating office, business and supporting functions. The building has extremely high requirements for intelligent operation and safety protection, requiring integrated cabling support for 9 core systems including monitoring, access control, broadcasting, infrared alarm, visitor management, network equipment, patrol, parking management and data room engineering. The key demands include high reliability (24\/7 stable operation), strong compatibility (adapting to multi-brand equipment), intelligent interconnection (realizing data sharing between systems) and strict delivery schedule (completing cabling supporting before the building&#8217;s trial operation within 180 days).<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9-1024x768.png\" alt=\"\" class=\"wp-image-678\" srcset=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9-1024x768.png 1024w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9-300x225.png 300w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9-768x576.png 768w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9-600x450.png 600w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/907ba464875c10f7596257bcedc20bd9.png 1440w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p style=\"line-height:1.8\"><strong>Supplied Products<\/strong>: Cat6A shielded network cables (250,000 boxes) for data transmission of multiple systems, flame-retardant power cables (ZRRVV 3*2.5mm\u00b2, 300,000 meters) for equipment power supply, coaxial cables (SYV 75-5, 80,000 meters) for monitoring and broadcasting signals, shielded control cables (KVVP 4*1.0mm\u00b2, 50,000 meters) for access control and alarm systems, and a full set of structured cabling components (10,000 sets of patch panels, crystal heads, junction boxes, etc.)<\/p>\n\n\n\n<p style=\"line-height:1.8\"><strong>Core Advantages Demonstration<\/strong>: \u2460 Technical Team Collaboration: A 7-person special technical team was established to conduct 5 on-site surveys with the client&#8217;s engineering department and intelligent system integrator, jointly developing a &#8220;unified cabling architecture + system-specific branch&#8221; solution. Targeting the high-rise building&#8217;s signal attenuation problem, the team optimized the cable conductor material and shielding structure to ensure stable signal transmission across 68 floors. \u2461 18-Year Experience Support: Relying on rich experience in super high-rise building cabling, the recommended Cat6A network cables passed Fluke DSX-8000 testing, with transmission rate up to 10Gbps and interference attenuation rate of 99.2%. All products obtained national fire protection certification (GB 50217-2018) and environmental protection certification. \u2462 Full-System Compatibility Design: The technical team pre-tested the compatibility of cables with 8 major brands of equipment (including Hikvision, Dahua, Cisco) in the laboratory, and customized cable interface specifications for special equipment such as parking management systems, reducing on-site debugging time by 40%. \u2463 Delivery &amp; Service Guarantee: Adopted &#8220;three-shift parallel production + regional segmented delivery&#8221; mode, and completed all product delivery 10 days in advance. The technical team was stationed on site for 60 days to provide cabling guidance and joint debugging services, ensuring that all 9 systems passed acceptance at one time.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"820\" height=\"1024\" src=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1-820x1024.png\" alt=\"\" class=\"wp-image-680\" srcset=\"https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1-820x1024.png 820w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1-240x300.png 240w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1-768x959.png 768w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1-600x749.png 600w, https:\/\/verdewire.com\/wp-content\/uploads\/2026\/03\/0fa94f4d29858447a27e70203ccc2871-1.png 1060w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/figure>\n\n\n\n<p style=\"line-height:1.8\"><strong>Customer Feedback<\/strong>: &#8220;As a landmark building, we have zero tolerance for system failures. The integrated cabling solution provided by the team not only ensures the stable operation of 9 core systems but also realizes seamless data interconnection. The professional collaboration of the technical team and the strict quality control have exceeded our expectations. They are indeed a reliable partner for large-scale projects.&#8221; \u2014 Mr. Zhang, Project Technical Director of China Resources Property<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Background: The client is China Resources Group, and the project is its Shenzhen Headquarters Building \u2014 a landmark super high-rise building integrating office, business and supporting functions. The building has extremely high requirements for intelligent operation and safety protection, requiring integrated cabling support for 9 core systems including monitoring, access control, broadcasting, infrared alarm, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":675,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[],"class_list":["post-672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-case"],"_links":{"self":[{"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/posts\/672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/comments?post=672"}],"version-history":[{"count":1,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/posts\/672\/revisions"}],"predecessor-version":[{"id":681,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/posts\/672\/revisions\/681"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/media\/675"}],"wp:attachment":[{"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/media?parent=672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/categories?post=672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/verdewire.com\/index.php\/wp-json\/wp\/v2\/tags?post=672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}